Insurance · Legacy to Cloud
Migrating 1TB of Legacy Insurance Data to Azure, Across Continents
Project Snapshot
- Client : Global leader in insurance and financial services, serving millions of customers
- Industry : Insurance and financial services
- Scope : ETL strategy, schema mapping, data cleansing, migration execution and cutover
- Platforms : Cloud data platform and web
- Technologies : Azure SQL, Azure Data Factory, SQL Server Integration Services, Informatica PowerCenter, IBM DB2
- Moved : Over 1TB from IBM DB2 into Azure SQL, 300+ tables into 60+ optimised ones
The Impact
1TB+
Legacy data moved from IBM DB2 into a modern Azure SQL environment
300 → 60+
Tables mapped and restructured, with the business logic carried across
100%
Business logic preserved, despite gaps in the source documentation
Hundreds
Of operational hours returned by ending manual data checks
Overview
A global insurance and financial services group held decades of customer data in legacy IBM DB2 systems. The business needed it somewhere it could actually be used, and three things were blocked until that happened:
- a 360-degree view of customer portfolios, impossible while data sat in separate systems,
- market analysis quick enough to respond to competitors rather than report on them, and
- security and governance standards that legacy sprawl made difficult to guarantee.
Migration at this scale is an execution problem before it is an architecture one. The source systems keep serving customers while you move them, the structures do not match the target, and the servers are not on the same continent.
Brain Station 23 ran a structured ETL strategy: mapping, cleaning and consolidating more than 1TB of legacy data into a modernised, high-performance Azure SQL environment.
The measure of success was not that the data arrived. It was that the business logic arrived with it, intact, and that nobody working in the source systems noticed the move.
Business Challenges
Every legacy migration has the same shape of risk: the data is knowable, but the rules around it live in code nobody documented, and the window to move it is never as wide as anyone wants.
Five pressures shaped the work.
- Data was scattered. Information fragmented across multiple legacy systems prevented any unified, 360-degree view of a customer portfolio.
- Retrieval took too long. Pulling data from manual sources was slow enough to delay decisions that mattered commercially.
- Quality was poor. Messy legacy data with no unique identification made accurate customer tracking and analytics unreliable.
- Market response was slow. Poor data accessibility held back the rapid, competitive analysis the business needed to do.
- The systems were incompatible in three ways at once. Moving this volume meant reconciling different database structures, different character encodings, and geographic latency between source and target that cut transfer throughput.
The last point is what turns a migration plan into a migration project: throughput you cannot control decides how much you can move inside a safe window.
Migration window too narrow for the data?
Bring it to a 30-minute call — we will come back with an approach and a scoped estimate.
What We Built
The approach was built around the constraints rather than against them: map before moving, validate on the way through, and engineer for the latency that could not be removed.
A unified repository
All the scattered legacy data was consolidated into a single modernised SQL system, which is what makes full portfolio transparency possible rather than merely promised.
Schema optimisation
More than 300 legacy tables were mapped and transformed into 60+ optimised tables using SSIS, preserving complex legacy business logic despite the documentation gaps that made it hard to find in the first place.
Performance engineering across geographies
Informatica PowerCenter was used to work around geo-latency between source and target servers, maximising throughput during the high-risk migration windows when the transfer actually had to happen.
Data governance and cleansing
Rigorous cleaning and validation removed duplicates as the data moved, so quality problems were fixed in transit instead of being carried into the new platform.
Security to industry standard
Advanced security protocols were applied to safeguard sensitive customer information and meet the standards this industry is held to.
A scalable target platform
The destination is a modernised Azure SQL platform with automated snapshot backups and cost-effective cloud scaling, so recovery and growth are configuration rather than projects.
The Results
The migration completed with the logic intact, and the effects show up in what the business can see, how fast it can act, and what it no longer spends time on.
Visibility and speed
Leadership gained complete visibility of customer portfolios, supporting faster and better-founded decisions. Time-to-market for new services fell as reliable market analysis became possible, and data reading and application display times improved substantially once the schema was optimised.
Integrity, cost and continuity
All business logic was preserved through the schema transformations, so the new system reconciles against the old. Ending manual data checks returned hundreds of operational hours, cloud scaling reduced cost, and the platform connects cleanly to modern applications and third-party tools with streamlined disaster recovery behind it.
The detail worth carrying into your own migration is the one that sounds least technical: the source documentation was incomplete, so the business rules had to be recovered from the systems themselves before anything could move safely.
That work does not show up in a project plan as a deliverable. It is the difference between a migration that reconciles and one that quietly changes the numbers.
Sitting on a legacy system nobody wants to move?
You might have undocumented business rules, source and target in different regions, or a migration window too narrow for the volume. In every case, the first step is the same.
Book a 30-minute call with Brain Station 23. Bring your source systems and your constraints, and we will come back with a migration approach, a delivery plan and a scoped estimate.
Migration window too narrow for the data?
Bring it to a 30-minute call — we will come back with an approach and a scoped estimate.
Related Case Studies